Landscape project: day five

Jul 12, 2006 – 7 Photos

Day five: More prep for the concrete pour, with framing and base-wire set out. A six-foot block of the front walk was hammered out so that the tile which would eventually lay on top of the pad would gently slope down to the existing grade.

Comments are closed.